The project is located on the Tereblia river in Zakarpatie region, Ukraine. The purpose of the project is generating of electrical power.
It includes:
- spillway dam of 110 m long;
- reservoir of 19 mln m3 net volume;
- penstock of 3635 m long;
- penstock of 380 m long;
- powerhouse;
- emergency spillway.
The powerhouse is equipped with three hydro units that utilise centrifugal turbines and vertical generators, of 9 MW each.
The plant output is 133 mln.kWh per year.

Tereblia-Rica Hydropower Project
|
|