This project is located on the Santiago river in Nayarit State, Mexico, downstream Aguamilpa HPP, and has been designed to control the HPP daily discharges.
It includes:
- non-overflow concrete gravity dam of 259m long and of 21m height;
- broad crested spillway of 68.5m wide with 6 bays that closed with radial gates;
- antechamber concrete gravity wall of of 125 m long and of 20 m height;
Ukrhydroproject company elaborated design of the gated bays of the flood and construction water spillways.
Main parameters of the project:
|
total reservoir storage
|
12.2 mln. m3
|
|
max discharge through the structures
|
6350 m3/s
|
Buffer HPP of the following parameters shall be constructed:
|
HPP capacity
|
24 MW
|
|
Design discharge
|
187.5 m3/s
|
|
Design head
|
14.7 m
|
Ukrhydroproject company elaborated detailed design of the spillway dam and coordinated supply of eight sector gates of 8.5 x 15.41 x 16.0 m with hydraulic rams and oil pressure units; the company also provided supervision of construction and erection works, and elaborated the preliminary study for the future hydropower plant.