site map   rus| eng
Projects
Hydroenergetic objects

Dnieper HPP cascade
Dnieper HPP
Dnieprodzerzhynsk HPP
Kaniv HPSP (design)
Kaniv HPP
Kakhovka HPP
Kyiv HPSP
Kyiv HPP
Kremenchuk HPP

Dniester HPP cascade
Dniester HPSP
Dniester HPP-1
Dniester HPP-2
Dubossary HPP

Other objects
Tashlyk HPSP
Tereblia-Rica HPP

Projects abroad
San Rafael hydro development
Thakmo HPP
Yali HPP
Can Don HPP
Nasseryah Pumping Station, Iraq

Shipping locks
Wind power projects
Tail storages
Canals for water supply and irrigation
Studies on rational usage and protection of water resources
Studies on rational usage and protection of water resources
  1. Water resources scheme of Ukraine
  2. Schemes of integrated water utilization and conservation for Ukraine, Byelorussia and Moldova
  3. Scheme of water utilization for power production. The Tisa river and its tributaries.
  4. Schemes of integrated water utilization and conservation for Kharkiv region
  5. Integrated water utilization scheme of near-border part of the Danuba river and partial the Danuba run-off diversion into the Dnieper river
  6. Integrated water utilization scheme of Azov sea basin
  7. Integrated water utilization scheme of the Western Bug river basin
  8. Scheme of water utilization for power production. Part of the Tisa river near Romanian border.
  9. Integrated water utilization scheme, water conservation and flood-protection of the Tisa river
  10. Arrangement scheme on the Seversky Donets river underground water conservacy
main | board | services | projects | contacts

© Ukrhydroproject PJSC
9 Lenin av., Kharkiv 61166, Ukraine,
phone (057)7-175-705, fax (057)7-194-730
e-mail: 
Quality ñertificate ISO 9001:2000