The project is located on the Dnieper river upstream Kremenchuk, Ukraine.
It consists of:
- hydro power plant;
- spillway dam;
- navigation facilities;
- earth dams;
Main parameters of the project:
|
total reservoir storage
|
13.52 km3
|
|
max discharge through the structures
|
24160 m3/s
|
|
max static head
|
17.0 m
|
|
HPP installed capacity
|
625 MW
|
|
average annual output
|
1506 mln kW h
|

Kremenchuk Hydropower Project. Tailrace view
|

Kremenchuk Hydropower Project. Power house. Removable covers above the units
|

Kremenchuk Hydropower Project. Gantry crane of 500t capacity
|
|