The project is located on the Dnieper river upstream Kyiv, near Vyshgorod, Ukraine. The project is designed for power supply, river navigation, and fish-breeding.
It includes:
- HPP combined with overflow spillway;
- navigation facilities;
- earth dams;
- protection dykes, right bank protection.
Main parameters of the project:
|
total reservoir storage
|
3 km3.73
|
|
max discharge through the structures
|
14400 m3/s
|
|
max static head
|
12.0 m
|
|
HPP installed capacity
|
361.0 MW
|
|
average annual output
|
635 mln kW h
|

Kyiv HPP
|
|