Dubossary HPP is located in the lower reach of the Dniester river, in Moldova. The project is a multipurpose one, and is designed for power supply, irrigation, fish-breeding, and water supply.
It includes:
- low-head run-of-river powerhouse with erection bay and service buildings;
- concrete spillway dam;
- right bank earthfill dam and hydraulic fill dams.
Run-of-river powerhouse is situated on the left bank flood-lands of the Dniester river.
Main parameters of the project:
|
total reservoir storage
|
254.80 mln. m3
|
|
max discharge through the structures
|
400 m3/s
|
|
max static head
|
14.45 m
|
|
HPP installed capacity
|
48 MW
|
|
average annual output
|
260 mln kW h
|
|