site map   rus| eng
Projects
Hydroenergetic objects

Dnieper HPP cascade
Dnieper HPP
Dnieprodzerzhynsk HPP
Kaniv HPSP (design)
Kaniv HPP
Kakhovka HPP
Kyiv HPSP
Kyiv HPP
Kremenchuk HPP

Dniester HPP cascade
Dniester HPSP
Dniester HPP-1
Dniester HPP-2
Dubossary HPP

Other objects
Tashlyk HPSP
Tereblia-Rica HPP

Projects abroad
San Rafael hydro development
Thakmo HPP
Yali HPP
Can Don HPP
Nasseryah Pumping Station, Iraq

Shipping locks
Wind power projects
Tail storages
Canals for water supply and irrigation
Studies on rational usage and protection of water resources
Dniester HPP-1
The project main site is located in the middle reach of the Dniester river, upstream Mogilev-Podolsk, Ukraine.

It includes:

  • hydro power plant of spillway type with erection bay;
  • left bank and right bank earth dams;
  • conjugation facilities;
  • left bank 330/110kV outdoor switchyard.

It is designed two road bridges: downstream - for service needs, upstream - of common use. Concrete structures are placed on the right bank of the river.

Main parameters of the project:


total reservoir storage 3 km3
max static head 54.0 m
HPP installed capacity 702 MW
average annual output 800 mln kW h

Dniester HPP-1 (1024x709, 177 kb)
Dniester HPP-1
Dniester HPP-1 (1024x707, 108 kb)
Dniester HPP-1
Dniester HPP-1 (1024x710, 99 kb)
Dniester HPP-1
Dniester HPP-1 (1024x708, 91 kb)
Dniester HPP-1
Dniester HPP-1 (1024x1472, 297 kb)
Dniester HPP-1

main | board | services | projects | contacts

© Ukrhydroproject PJSC
9 Lenin av., Kharkiv 61166, Ukraine,
phone (057)7-175-705, fax (057)7-194-730
e-mail: 
Quality ñertificate ISO 9001:2000