The project main site is located in the middle reach of the Dniester river, upstream Mogilev-Podolsk, Ukraine.
It includes:
- hydro power plant of spillway type with erection bay;
- left bank and right bank earth dams;
- conjugation facilities;
- left bank 330/110kV outdoor switchyard.
It is designed two road bridges: downstream - for service needs, upstream - of common use. Concrete structures are placed on the right bank of the river.
Main parameters of the project:
|
total reservoir storage
|
3 km3
|
|
max static head
|
54.0 m
|
|
HPP installed capacity
|
702 MW
|
|
average annual output
|
800 mln kW h
|